Sample manager maintenance procedures

Sample manager maintenance procedures
Topic LCI-USG-0200, Last Updated 11/08/2024

This section provides maintenance procedures for the Alliance iS HPLC System sample manager that users or Waters field service personnel can perform.

The procedures include:

  • Replacing the leak sensor
  • Calibrating the needle z axis
  • Replacing the needle seal and seal port tubing
  • Replacing the needle

Need Help? Connect with a Waters expert. 


To avoid risk of personal injury and to prevent damage to laboratory equipment, always operate your Waters products in accordance with the applicable operational and safety information, your organization’s standard operating procedures, and local regulations.

Refer to the English version of this page for the latest information.

Back To Top Back To Top