Pump maintenance procedures

Pump maintenance procedures
Topic LCI-USG-0162, Last Updated 11/08/2024

This section provides maintenance procedures for the Alliance iS HPLC System pump that users or Waters field service personnel can perform. Procedures include:

  • Servicing the pump compartment air filter
  • Replacing the pump leak sensor
  • Replacing the pump mixer
  • Replacing the in-line filter cartridge on the primary check valve
  • Replacing the accumulator check valve

Need Help? Connect with a Waters expert. 


To avoid risk of personal injury and to prevent damage to laboratory equipment, always operate your Waters products in accordance with the applicable operational and safety information, your organization’s standard operating procedures, and local regulations.

Refer to the English version of this page for the latest information.

Back To Top Back To Top