Sample manager maintenance procedures

Sample manager maintenance procedures
Topic LCI-USG-0200, 最近更新 11/22/2024

This section provides maintenance procedures for the Alliance iS HPLC System sample manager that users or Waters field service personnel can perform.

The procedures include:

  • Replacing the leak sensor
  • Calibrating the needle z axis
  • Replacing the needle seal and seal port tubing
  • Replacing the needle

需要協助嗎?聯絡Waters專家。 


為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。

回到頁首 回到頁首