Pump maintenance procedures

Pump maintenance procedures
Topic LCI-USG-0162, 最近更新 11/22/2024

This section provides maintenance procedures for the Alliance iS HPLC System pump that users or Waters field service personnel can perform. Procedures include:

  • Servicing the pump compartment air filter
  • Replacing the pump leak sensor
  • Replacing the pump mixer
  • Replacing the in-line filter cartridge on the primary check valve
  • Replacing the accumulator check valve

需要協助嗎?聯絡Waters專家。 


為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。

回到頁首 回到頁首